|
Total Ownership Cost (TOC)
Total Ownership Cost (TOC) as defined by the Department of the Navy (DoN), "includes all costs associated with the research, development, procurement, operation and disposal of an individual weapon system over its full life." In other words, the full life cycle cost of a system. This definition is found in the letter dated 29 July 2009 jointly signed by the Vice Chief of Naval Operations (VCNO); Assistant Secretary of the Navy for Research Development and Acquisition (ASN(RD&A)); and Assistant Commander of the Marine Corps (ACMC). Further amplification of the definition is provided in reference (a) of the same.
The following is intended to provide programs with guidance and tools for preparing baseline TOC plans and individual TOC initiatives.
|
|
|
701K
|
|
|
OSD CAPE guidance for Components in developing estimates of system Operating and Support (O&S) costs.
|
|
Category:
|
TOC Baseline Guidance
|
Date:
|
Oct. 2007
|
|
|
110K
|
|
|
USD(A&T) memorandum on Future Readiness.
|
|
Category:
|
TOC Baseline Guidance
|
Date:
|
May 10, 1999
|
|
|
136K
|
|
|
ASN(RD&A) memorandum providing guidance for implementation of Total Ownership Cost (TOC) baselines within the Department of the Navy.
|
|
Category:
|
TOC Baseline Guidance
|
Date:
|
May 5, 1998
|
|
|
33K
|
|
|
NAVAIR memorandum providing guidance for implementation of Total Ownership Cost (TOC) baselines.
|
|
Category:
|
TOC Baseline Guidance
|
Date:
|
Jul. 31, 1998
|
|
|
86K
|
|
|
TOC Work Breakdown Structure (WBS) elements for Aircraft, Electronics and Missiles (MS-Excel 2003).
|
|
Category:
|
TOC Baseline Guidance
|
Date:
|
May 5, 1998
|
|
|
|
|
66K
|
|
|
Examples for reducing Total Ownership Cost.
|
|
Category:
|
TOC Initiative Guidance
|
Date:
|
Jan. 11, 2008
|
|
|
745K
|
|
|
A light-hearted “How To” guide for cost estimating.
|
|
Category:
|
TOC Initiative Guidance
|
Date:
|
May 22, 2002
|
|
|
|
|
|
|
2.5MB
|
|
|
NAVAIR's Total Ownership Cost (TOC) templates version 5.2.7v1 for MS-Excel 2003.
|
|
Category:
|
TOC Tools and Templates
|
Date:
|
Sep. 29, 2009
|
|
|
786K
|
|
|
NAVAIR guide to assist in the preparation and evaluation of cost analyses of alternative maintenance concepts to reduce naval aviation operating and support (O&S) costs.
|
|
Category:
|
TOC Tools and Templates
|
Date:
|
Dec. 1, 2004
|
|
|
|
|
|
The Navy's Visibility and Management Operating and Support Costs (VAMOSC) system that collects and reports Navy and Marine Corps historical Operating and Support (O&S) costs.
|
|
Category:
|
TOC Tools and Templates
|
Date:
|
NA
|
|
|
|
|
233K
|
|
|
A list of answers to some of the most frequently asked questions regarding Total Ownership Cost (TOC).
|
|
Category:
|
TOC FAQ
|
Date:
|
Jun. 6, 2011
|
|
|